|
._._
<br /> SP REA
<br /> DSHEET FOR SITE SOIL MASS BALANCE
<br /> PHASE EXCAVATION: EXCAVATION FILL
<br /> . (ROUNDED TO NEAREST 10,000)
<br /> AREA DEPTH VOLUME
<br /> (FT^2) (FT) (Cy)(1)
<br /> PHASE 1 809.600 5 149,925
<br /> PHASE 11 857,900 10 317,741
<br /> 12 390,400
<br /> PHASE 111 878.400 15 1.022,167
<br /> PHASE IV 1,839,900 ® 0
<br /> PHASEV 1,240,200 0 0
<br /> PHASE VI 2,375,000
<br /> TOTAL 8,001,000 1,880,233 1,880,
<br /> CHANNEL EXCAVATION (NOT INCLUDING FILL AREA TO WEST OF LANDFILL)
<br /> AREA LENGTH VOLUME
<br /> (FT^2) (M (C`) (1) -
<br /> 214 6,000 47,444 47,000
<br /> FLOODPLAIN EXCAVATION (NOT INCLUDING FILL AREA TO WEST OF LANDFILL)
<br /> AREA DEPTH VOLUME
<br /> (FT"2) n (Cy) (1)
<br /> WEST 220.000 5 40.741
<br /> NORTH 160,000 5 29,630
<br /> TOTAL: 70,370 70,000
<br /> LANDFILL SURFACE WATER FACILITY EXCAVATION
<br /> VOLUME
<br /> (Cy)
<br /> 32,933 33,000
<br /> DAILYIINTERMEDIATE SOIL REOWREMENTS
<br /> TOTAL APSOIUREFU! VOLUME
<br /> (CY) ( 400`0
<br /> EXISTING 1,600,000 3
<br /> PHASE I 1,200,000 3 300,000
<br /> 425,000
<br /> PHASE II 1,700,000 3 392,500
<br /> PHASE 111 1,570,000 3 980,000
<br /> PHASE IV 3,920,000 3 840,000
<br /> PHASEV 3,360!000
<br /> PHASEVI 6,300,000 3 1,575,000
<br /> TOTAL: 4.912,500 4,913;000
<br /> i
<br /> PAIN,=-0-2L`-Nov-"r2 FI::' ::\AUS"IN\601L.WK3
<br />
|