|
LINER SOIL REQUIREMENTS:
<br /> AREA DEPTH VOLUM w
<br /> (FT"2) FD (CY) (1 1%
<br /> PHASE 1 809,600 2 59,970
<br /> PHASE II 857,900 2 63,548
<br /> PHASE III 878,400 2 65,067
<br /> PHASE IV 1,839,900 2 136,289
<br /> PHASEV 1,240,200 2 91,867
<br /> PHASE VI 2.375,000 2 175,925
<br /> TOTAL: 592,667 593,000
<br /> OPERATION LAYER
<br /> AREA DEPTH VOLUME
<br /> (FT^2) (Fr) (CY)(1)
<br /> PHASE 1 809,600 1.5 44,978
<br /> PHASE II 857,900 1.5 47,661
<br /> PHASE III 873,400 1.5 48,800
<br /> PHASE IV 1,839:900 1,3 102,217
<br /> PHASE 1,240,200 1.5 68,900
<br /> PHASE VI 2,375,000 1.5 131,944
<br /> TOTAL 444.500 4451000
<br /> FINAL COYER - pCtSTiNt3 LANDFILL
<br /> AREA DEPTH VOLUME
<br /> (FT-2) (CY)(1)
<br /> EX-FOND 4,640,000 1.0 171,852
<br /> EX-BARRIi: 4,640,000 1.0 171,852
<br /> TOPSOIL 4,640,000 1.0 171,852
<br /> TOTAL: 515,556 516,000
<br /> FINAL COVER - HORIZONTAL AND VERTICAL EXPANSIONS
<br /> AREA DEPTH VOLUME
<br /> (FT A 2) (FT) (0Y) (1)
<br /> PHASE 1 240.000 2.5 22.222
<br /> PHASE II 560,000 2.5 51.852
<br /> PHASE Ill 400.000 2.5 37,037
<br /> PHASE IV 1420,000 2.5 140,741
<br /> PHASE 1,920,000 2.5 177,778
<br /> PHASE VI 3,361,000 2.5 311.204
<br /> TOTAL: 740,833 741,000
<br /> TOTAL: 2,030,000 7,208,000
<br /> NET OUT. 5,178,000
<br /> AVG. DEPTH: 35 FT
<br /> EX.AREA 3,994,457 FT"2
<br /> LENGTH: 3,000 FT
<br /> r
<br /> WIDTH 1,331 FT r
<br /> (1)VOLUME(CY) m AREATOT
<br /> SL(FT
<br /> PACl1DEPTH 111/1(X+ 1) WHERE 1:X,'S
<br /> (2)VOLUME(CY)
<br /> RATIO OF COVER TO WASTE
<br /> t
<br /> PRIN-K),2^.-Nov-92 FILE-0\AUST!N'.S0iL.VVK3 PAG_
<br />
|