My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUcriON <br /> 1.4 RDSI AMENDMENTS <br /> In following the CIWMB desk manual format for this RDSI matrix, it was <br /> determined that certain responses requested greater detail than was considered <br /> appropriate based on the conceptual design to date of the landfill expansion. In <br /> particular issues regarding construction level design for landfill liners and landfill <br /> cover systems can not be fully addressed until an actual design has been <br /> prepared. This is because the modifications may be made to the liner design for <br /> subsequent stages of landfill construction due to evolution in liner materials and <br /> liner design and future modifications to the regulations. Also, operation and <br /> monitoring procedures will change over the life of the proposed facility <br /> expansion in response to site conditions and future regulatory changes. These <br /> issues are recognized in the response column as requiring future amendments to <br /> the landfill's RDSI to update the Solid Waste Facility Permit subject to regulatory <br /> review and approvals. Finally, the RDSI will require amendments outlining <br /> conditions included in other permits related to the project. <br /> 0.\JNGHA"LI059.DOC I7!131% R.W Beck 1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.