My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1996_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
ARCHIVED REPORTS_1996_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:10 PM
Creation date
7/3/2020 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1996_1
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1996_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RDSI Matrix <br /> DSI SECTION REG. CITATION RESPONSE [REFERENCE <br /> V.F.5. Safety Equipment 14 CCR 17670 Operator issues the following safety equipment to employees: hard <br /> hats, reflective safety vests, leather gloves, coveralls, safety boots <br /> with steel shank in sole, and safety glasses. Operator also makes <br /> dust masks available to employees who are exposed to dust in the <br /> course of their duties. The operation manager checks out all <br /> personnel before they go to work to ensure they have all their safety <br /> equipment on and that it is in good working order. <br /> VI. DISPOSAL SITE CONTROLS <br /> VI.A. LEACHATE MANAGEMENT PLAN <br /> VI.A.1. Leachate Control and <br /> Monitoring <br /> VI.A.1.a. Monitoring System 14 CCR General layout of the leachate monitoring system is indicated on Appendix B, <br /> 17781(c)(1)(A) Drawings P1, P3, and P4. Details on Drawings P6 and P7 indicate CEP Dwg. P1, <br /> 14 CCR 17781(b)(3) conceptual leachate collection methods. FDSR Section 1.3 CEP Dwg. P3, <br /> discusses the leachate collection system. An amendment will be filed CEP Dwg. P4, <br /> at the time of final design of each construction phase; this CEP Dwg. P6, <br /> amendment will address the specific materials, methods, and CEP Dwg. P7 <br /> dimensions of monitoring and will be certified by a registered Appendix I, FDSR <br /> engineer or engineering geologist. Sec. 1.3, Pages 1-5 <br /> to 1-12 <br /> VI.A.1.b. Monitoring and <br /> Reporting <br /> VI.A.1.b.1. Frequency 14 CCR 17781(d)(1) An amendment will be filed at the time of final design of each phase <br /> 14 CCR 17781(d)(2) to describe sampling frequency. Minimum frequency is assumed to <br /> 14 CCR 17781(d)(4) be quarterly. <br /> R.W. Beck 2-19 <br /> Revised October 2, 1997 <br /> City of Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.