Laserfiche WebLink
� r <br /> SECTIONRDSI • . _ • REFERENCE 7 <br /> Monitoring System 23 CCR Layout of the groundwater monitoring system <br /> • amendmentbe filed at the time of design of each CEP r • <br /> • -; this amendment will address the specific • . of r • <br /> background and detection m., • • points. - detection <br /> system consists of vadose zone trench lysymetersystem, Dwg. P6 <br /> underlies the leachate collection trenches. The layout of the leachate <br /> collection systemDrawings P3 and P4. Details are <br /> shown on ;, P6. <br /> VI.A.2.b. Sampling IIII <br /> Procedures - _ general description of the leak detection systemprovided Appendix r <br /> estimated frequency of monthly monitoring. An amendment will be Sec. 3.5, Page 3-5 <br /> filed at the time of final design of each phase; this amendment will <br /> describe sampling procedures . chemicalparameters to be tested <br /> 14 CCR 17781(d)(6) An amendment will be filed at the time of final design of each phase; <br /> this amendment will describe reporting requirements. <br /> VI.A.3. Groundwater Monitoring <br /> 14 CCR 18222(l) There are currently 11 monitoring wells down gradient and three7! Appendix B <br /> 23 CCR 51 • • • wells upgradientof • landfill. • • on - CEP i i <br /> existing monitoring system is included in Appendix K (WDR) and Appendix 1, FDSR <br /> , Appendix N (Existing Groundwater Monitoring System). New P�-%'"W*r.7',- �'d <br /> monitoring wells for the expansion will be added as indicated on to 3-2 <br /> Drawing P1. An amendmentthe time of final designAppendix <br /> each phase; this amendment d -ss the specific locations, Appendix <br /> depths, materials, construction requirements, well logs, and certify <br /> that a registered civil engineer or geologist was responsible for the <br /> design. i accordance with the Waste <br /> r . .- Requirements for the landfill expansion. <br />