Laserfiche WebLink
RDSI Matrix <br /> RDSI SECTION REG. CITATION RESPONSE IREFERENCE <br /> VI.G. DRAINAGE AND EROSION CONTROL <br /> 14 CCR 17708 Erosion control measures include maximum slope of 4:1, matting and Appendix 1, FDSR <br /> silt fences, phased and partial coverage, and maintenance of Sec. 1.5.7, Pages <br /> vegetative cover. 1-19 to 1-20; FDSR <br /> Sec. 1.6, Pages 1- <br /> Surface water control systems to handle 100-year, 24-hour 20 to 1-28; FDSR <br /> precipitation event. Appendix D <br /> Appendix B, <br /> CEP Dwg P1, <br /> CEP Dwg. P7, <br /> Details I and 3 <br /> VI.H. LITTER CONTROL <br /> 14 CCR 17711 Compaction and prompt coverage of the refuse. Orient the working Appendix 1, FDSR <br /> 14 CCR 17683 face on the downwind side of prevailing winds. Litter and debris pick- Sec. 2.2.2, Page 2- <br /> up as necessary. Litter control fences. 16 <br /> V1.1. NOISE CONTROL <br /> 14 CCR 17712 Operate only during permitted hours. Maintain buffer zone. Periodic Appendix 1, FDSR <br /> noise measurements at the boundaries. Sec. 2.2.2, Page 2- <br /> 17 <br /> VIA. ODOR CONTROL <br /> 14 CCR 17713 Daily cover and operation of landfill gas control system. Periodic Appendix 1, FDSR <br /> monitoring at site perimeter. Sec. 2.2.2, Page 2- <br /> 16 <br /> TRAFFIC CONTROL <br /> R.W. Beck 2-26 <br /> Revised October 2, 1997 <br /> City of Stockton <br />