Laserfiche WebLink
VI.G. DRAINAGE AND EROSION CONTROL <br /> 14 CCR 17708 Erosion control measures include maximum slope of 4:1, Appendix I, FDSR <br /> matting and silt fences, phased and partial coverage, and Sec. 1.5.7, Pages 1- <br /> maintenance of vegetative cover. 19 to 1-20; FDSR <br /> Sec. 1.6, Pages 1-20 <br /> Surface water control systems to handle 100-year, 24-hour to 1-28; FDSR <br /> precipitation event. Appendix D <br /> Appendix B, <br /> CEP Dwg P1, <br /> CEP Dwg. P7, <br /> Details 1 and 3 <br /> VI.H. LITTER CONTROL <br /> 14 CCR 17711 Compaction and prompt coverage of the refuse. Orient the Appendix I, FDSR <br /> 14 CCR 17683 working face on the downwind side of prevailing winds. Litter Sec. 2.2.2, Page 2- <br /> and debris pick-up as necessary. Litter control fences. 16 <br /> VI.I. NOISE CONTROL <br /> 14 CCR 17712 Operate only during permitted hours. Maintain buffer zone. Appendix 1, FDSR <br /> Periodic noise measurements at the boundaries. Sec: 2.2.2, Page 2- <br /> 17 <br /> VI.J. ODOR CONTROL <br /> 14 CCR 17713 Daily cover and operation of landfill gas control system. Appendix 1, FDSR <br /> Periodic monitoring at site perimeter. Sec. 2.2.2, Page 2- <br /> 16 <br /> VIX TRAFFIC CONTROL <br /> 14 CCR 17714 Permanent signs and attendant to direct on-site traffic Appendix 1, FDSR <br /> management. Sec. 2.1.6, Page 2-8 <br /> Appendix H, DEIR <br /> No stacking on adjacent public road is anticipated. Sec. III.D, Pages <br /> III.D.1 - III.D.11 <br /> The level of service is projected to range from LOS A to LOS <br /> D, which is the minimum acceptable for the City of Stockton, <br /> during the a.m. peak-hour with or without the landfill <br /> expansion. <br />