Laserfiche WebLink
VI.A.2.b. Sampling Procedures <br />14 CCR 17781(d)(5) <br />A general description of the leak detection system is provided <br />Appendix I, FDSR <br />with an estimated frequency of monthly monitoring. An <br />Sec. 3.5, Page 3-5 <br />amendment will be filed at the time of final design of each <br />phase; this amendment will describe sampling procedures and <br />chemical parameters to be tested for. <br />VI.A.2.c. Reporting <br />14 CCR 17781(d)(6) <br />An amendment will be filed at the time of final design of each <br />phase; this amendment will describe reporting requirements. <br />VI.A.3. Groundwater Monitoring <br />VI.A.3.a. Monitoring System <br />14 CCR 18222(1) <br />There are currently 11 monitoring wells down gradient and <br />Appendix B, <br />23 CCR 2550.7 <br />three monitoring wells upgradient of the existing landfill. <br />CEP Dwg. P1 <br />Information on the existing monitoring system is included in <br />Appendix I, FD <br />Appendix K (WDR) and Appendix N (Existing Groundwater <br />Sec. 3.1, Pag 1 <br />Monitoring System). New monitoring wells for the expansion <br />to 3-2 <br />will be added as indicated on Drawing P1. An amendment will <br />Appendix K <br />be filed at the time of final design for each phase; this <br />Appendix N <br />amendment will address the specific locations, depths, <br />materials, construction requirements, well logs, and certify that <br />a registered civil engineer or geologist was responsible for the <br />design. Monitoring system will be in accordance with the <br />Waste Discharge Requirements for the landfill expansion. <br />VI.A.3.b. Sampling and Analytic <br />23 CCR 2550.7(e)(4) <br />A general discussion of parameter/constituent sampling and <br />Appendix I, FDSR <br />Procedures <br />23 CCR 2550.7(e)(5) <br />reporting frequency requirements is provided in the FDSR. <br />Sec. 3.1, Pages 3-1 <br />23 CCR 2550.7(e)(12)(B) <br />The existing analytic procedures are in Appendix O. An <br />to 3-2 <br />23 CCR 2550.7(e)(13) <br />amendment will be filed at the time of final design of each <br />Appendix O <br />phase; this amendment will describe specific procedures <br />methods, and frequencies as well as parameters to be <br />sampled. Sampling and Analytic procedures will be in <br />accordance with the Waste Discharge Requirements for the <br />landfill expansion. <br />VI.B. GAS CONTROL AND MONITORING <br />14 CCR 17705 <br />Discussions with personnel from the CIWMB, the LEA, and <br />Appendix I, FDSR <br />14 CCR 18222(m) <br />the City have indicated that gas migration has not been a <br />Sec. 1.7, Pages 1-28 <br />problem at the landfill. Combustible Gas Indicator readings <br />to 1-29 <br />taken by personnel from the CIWMB have shown that there <br />have been no compliance problems at the boundary for the <br />Appendix Q <br />last few years. Gas monitoring reports are in Appendix Q. <br />