Laserfiche WebLink
VI.G. DRAINAGE AND EROSION CONTROL <br />14 CCR 17708 <br />Erosion control measures include maximum slope of 4:1, <br />Appendix I, FDSR <br />matting and silt fences, phased and partial coverage, and <br />Sec. 1.5.7, Pages 1- <br />maintenance of vegetative cover. <br />19 to 1-20; FDSR <br />Sec. 1.6, Pages 1-20 <br />Surface water control systems to handle 100-year, 24-hour <br />to 1-28; FDSR <br />precipitation event. <br />Appendix D <br />Appendix B, <br />CEP Dwg P1, <br />CEP Dwg. P7, <br />Details 1 and 3 <br />VI.H. LITTER CONTROL <br />14 CCR 17711 <br />Compaction and prompt coverage of the refuse. Orient the <br />Appendix I, FDSR <br />14 CCR 17683 <br />working face on the downwind side of prevailing winds. Litter <br />Sec. 2.2.2, Page l- <br />and debris pick-up as necessary. Litter control fences. <br />16 <br />VI.I. NOISE CONTROL <br />14 CCR 17712 <br />Operate only during permitted hours. Maintain buffer zone. <br />Appendix I, FDSR <br />Periodic noise measurements at the boundaries. <br />Sec. 2.2.2, Page 2- <br />17 <br />VI.J. ODOR CONTROL <br />14 CCR 17713 <br />Daily cover and operation of landfill gas control system. <br />Appendix I, FDSR <br />Periodic monitoring at site perimeter. <br />Sec. 2.2.2, Page 2- <br />16 ANIL <br />VIX TRAFFIC CONTROL <br />14 CCR 17714 <br />Permanent signs and attendant to direct on-site traffic <br />Appendix I, FDSR <br />management. <br />Sec. 2.1.6, Page 2-8 <br />Appendix H, DEIR <br />No stacking on adjacent public road is anticipated. <br />Sec. IIID, Pages <br />III.D.1 - III.D.11 <br />The level of service is projected to range from LOS A to LOS <br />D, which is the minimum acceptable for the City of Stockton, <br />during the a.m. peak-hour with or without the landfill <br />expansion. <br />