Laserfiche WebLink
RDSI SECTION REG. CITATION <br />RESPONSE <br />REFERENCE <br />V.F.S. Safety Equipment 14 CCR 17670 <br />Operator issues the following safety equipment to employees: <br />hard hats, reflective safety vests, leather gloves, coveralls, <br />safety boots with steel shank in sole, and safety glasses. <br />Operator also makes dust masks available to employees who <br />are exposed to dust in the course of their duties. The <br />operation manager checks out all personnel before they go to <br />work to ensure they have all their safety equipment on and <br />that it is in good working order. <br />VI. DISPOSAL SITE CONTROLS <br />VI.A. LEACHATE MANAGEMENT PLAN <br />VI.A.1. Leachate Control and <br />Monitoring <br />VI.A.1.a. Monitoring System <br />14 CCR 17781(c)(1)(A) <br />General layout of the leachate monitoring system is indicated <br />Appendix B, <br />14 CCR 17781(b)(3) <br />on Drawings P1, P3, and P4. Details on Drawings P6 and P7 <br />CEP Dwg. P1, <br />indicate conceptual leachate collection methods. FDSR <br />CEP Dwg. P3, <br />Section 1.3 discusses the leachate collection system. An <br />CEP Dwg. P4, <br />amendment will be filed at the time of final design of each <br />CEP Dwg. P6, <br />construction phase; this amendment will address the specific <br />CEP Dwg. P7 <br />materials, methods, and dimensions of monitoring and will be <br />Appendix I, FDSR <br />certified by a registered engineer or engineering geologist. <br />Sec. 1.3, Pages 1-5 <br />to 1-12 <br />VI.A.1.b. Monitoring and <br />Reporting <br />VI.A.1.b.1. Frequency <br />14 CCR 17781(d)(1) <br />An amendment will be filed at the time of final design of each <br />14 CCR 17781(d)(2) <br />phase to describe sampling frequency. Minimum frequency <br />14 CCR 17781(d)(4) <br />is assumed to be quarterly. <br />VI.A.1.b.2. Sampling <br />14 CCR 17781(d)(5) <br />An amendment will be filed at the time of final design of each <br />phase to describe sampling procedures and analysis <br />requirements for chemical parameter. <br />VI.A.1.b.3. Reporting <br />14 CCR 17781(d)(6) <br />An amendment will be filed at the time of final design of each <br />phase to describe reporting requirements. <br />VI.A.1.c. Leachate Collection and <br />23 CCR 2543 <br />A description of the leachate collection system is outlined in <br />Appendix B, <br />Removal System <br />23 CCR 2543(a) <br />the FDSR. General layout of the leachate collection and <br />CEP Dwg. P1, <br />23 CCR 2543(b) <br />removal system is indicated on Drawings P1, P3, and P4. <br />CEP Dwg. P3, <br />23 CCR 2543(d) <br />Details on Drawings P6 and P7 indicate conceptual leachate <br />CEP Dwg. P4, <br />