Laserfiche WebLink
Permitting&Enforcement Meetir Agenda Item <br /> January 15, 1998 <br /> Sun-Land Garden Products Composting Facility Accept- Unaccept- To Be Not See Details <br /> able able Deter- Applic- in Agenda <br /> Facility No.27-AA-0085 mined able Item <br /> CIWMP Conformance(PRC 50001) ✓ <br /> CoSWMP Conformance(PRG 50000) ✓ <br /> General Plan Conformance(PRC 50000.5) ✓ <br /> Conformance With State Minimum Standards J 1 <br /> California Environmental Quality Act ✓ 2 <br /> 1. Conformance with State Minimum Standards <br /> Although this is a new permit,the facility has been operating since 1986; a pre-permit <br /> inspection was conducted on November 14, 1997 by Board staff, in conjunction with the <br /> LEA.No violations of State Minimum Standards were noted. However,a violation of <br /> Public Resources Code Section 44002 was noted for operating without apermit; issuance <br /> of the permit would correct this violation. <br /> 2. California Environmental Quality Act(CEQA) <br /> State law requires compliance with the California Environmental Quality Act either <br /> through the preparation, circulation, and adoption/certification of an environmental <br /> document and mitigation reporting or monitoring program or by determining that the <br /> proposal is categorically or statutorily exempt. <br /> The Monterey County Planning Department, acting as Lead Agency, prepared a <br /> Mitigated Negative Declaration(MND), SCH#97011039, in January 1997 for the <br /> proposed project. As required by CEQA,the MND identified the proposed project's <br /> potential significant environmental impacts and provided mitigation measures that would <br /> reduce those impacts to less than significant levels. Board staff reviewed the MND and <br /> supporting documentation and provided comments to the Lead Agency on January 16, <br /> 1997. <br /> After reviewing the MND, Board staff have determined that CEQA documents are <br /> adequate for the Board's evaluation of the proposed project for those project activities <br /> which are within this Agency's expertise and/or powers, or which are required to be <br /> carried out or approved by the Board. <br /> V1. ATTACHMENTS <br /> 1. Location Map <br /> 2. Site Map <br /> 3. Permit No. 27-AA-0085 h <br /> G <br />