Laserfiche WebLink
KLEINFELDER <br /> 2.4 SITE CLOSURE <br /> The landfill is currently active. In May 1988, San Joaquin County, Department of Public <br /> Works submitted a Report of Waste Discharge to the RWQCB. The report included a <br /> design report and operations plan pursuant to Section 2596 of Subchapter 15. The design <br /> report contained Preliminary Design Plans which call out construction of the site in 4 <br /> Phases. Under these preliminary plans, Phase 1, which includes the areas filled to date, <br /> would be completed around the year 2015. <br /> A detailed closure plan for the site has not been completed to date. According to Title 14 <br /> CCR, Section 18255 the landfill is required to submit a closure and post closure <br /> maintenance plan to the state Local Enforcement Agency at the time of the next 5-year <br /> solid waste facility permit review. <br /> FOOTHILL 15 <br />