Laserfiche WebLink
MAINTAIN DRAINAGE SYSTEM <br /> Assuming 2 operators and two pieces of equipment for 12 days a year <br /> to keep ditches clear and some shaping at $700/day, the annual <br /> cost can be computed. <br /> 7 . COST <br /> ($700 X 12) _ $8,400 <br /> INSPECTIONS <br /> Inspections will be made on a quarterly basis for the following <br /> items: <br /> Final cover <br /> Final grading, settlement <br /> Drainage system <br /> Gas monitoring and control system <br /> Leachate collection system <br /> Ground water monitoring system <br /> Security <br /> Vector and fire control <br /> Litter control <br /> Sediment control devices <br /> It is assumed that inspections will take a consulting engineer <br /> approximately two working days to complete (16 hours) . The <br /> engineer will probably receive a rate of approximately $70/hour. <br /> The engineer will then prepare a report containing all observed <br /> deficiencies and suggested corrective measures. Each report is <br /> estimated to cost about $1, 000. The annual cost for the 5 year <br /> aerial survey is estimated at $1, 000 per year. <br /> 8. COST <br /> ($70 X 16 X 4) + ($1, 000 X 4) + $1, 000 = $9,480 <br /> 6 <br />