Laserfiche WebLink
Foothill Sanitary Landfill—Module 1 December 2003 <br /> County of San Joaquin Job No.031602.00.02 <br /> 1.0 INTRODUCTION <br /> 1.1 Purpose <br /> The purpose of this report is to document that the construction of Module 1 at the <br /> Foothill Sanitary Landfill was constructed in accordance with the following regulatory <br /> documents: <br /> • Title 27 of the California Code of Regulations <br /> • Waste Discharge Requirements for the Foothill Sanitary Landfill issued under <br /> Water Quality Control Board (Central Valley Region) Order R5-2003-00020. <br /> • Contract Documents for the Construction of Two Landfill Modules Project, <br /> including Plans and Specifications, (Department of Public Works, County of <br /> San Joaquin and EMCON/OWT, January 2003), as approved by CVRWQCB <br /> staff. <br /> • Quality Assurance Manual for Module Construction, Foothill Sanitary Landfill, <br /> Module 1 and North County Recycling Center and Sanitary Landfill, Module 4 <br /> EMCON/OWT, May 2003) as approved by CVRWQCB Staff. <br /> • Design adjustments for construction conditions, approved as needed by <br /> CVRWQCB staff. <br /> The report contains a discussion of the CQA procedures performed by Vector, a <br /> discussion of the construction activities, and a description of the liner components <br /> observed and tested by Vector. This report also contains appendices presenting the <br /> daily construction activities, earthworks testing results, geosynthetics testing results, <br /> logs of the geosynthetic materials delivered to the site; and other information pertaining <br /> to Vector's CQA Monitoring of the composite liner system installation. Photographic <br /> documentation of this project was maintained by Vector throughout the construction <br /> period and some pertinent photographs are presented in Appendix A of this report. <br /> 1.2 Statement of Compliance <br /> The composite liner system for Module 1 is complete and was installed in accordance <br /> with the Title 27 CCR, the Waste Discharge Requirements, and with the approved <br /> Construction Contract, CQA Manual, and construction modifications. A copy of the as- <br /> built construction drawings for the liner components and the design drawings are <br /> included as Exhibit A. <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> 1 <br />