My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foothill Sanitary Landfill—Module 1 December 2003 <br /> County of San Joaquin Job No.031602.00 02 <br /> 2.0 PROJECT DESCRIPTION <br /> 2.1 Project Components <br /> The project includes construction of a composite liner system for Module 1. Module 1 is <br /> approximately 36 acres. The elements that make up the liner system of Module 1 are as <br /> follows (bottom to top): <br /> FLOOR BOTTOM <br /> • Prepared 1-foot foundation layer <br /> • Geosynthetic clay liner(GCL) <br /> • 60-mil HDPE geomembrane (double-sided textured) <br /> • Leachate collection recovery system (LCRS) drain gravel and HDPE pipe <br /> • 0.75-foot granular drainage layer <br /> • 8-oz geotextile separator <br /> • 2-foot base operations soil layer <br /> SIDE SLOPE <br /> • Prepared subgrade <br /> • Geosynthetic clay liner(GCL) <br /> • 60-mil HDPE geomembrane (double-sided textured) <br /> • Geocomposite drain material <br /> • 2-foot side slope operations layer <br /> Vector Engineering, Inc. - 143E Spring Hill Drive-Grass Valley, CA 95945•(530)272-2448 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.