Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 25 55 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-23-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Muggy 1000 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />2-631 C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot <br />Cat compactor, 3 -Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: Man crew D&E: 2 Man crew <br />Wood Bros. continued to haul foundation layer material from the soil borrow area A to the southern portion <br />of Module 1. Wood Bros. processed and compacted the 7th bay 2nd lift and the 8th and 91h bay 1St lift utilizing <br />the D6 with disc, 825 sheepsfoot compactor, 2-631 scrapers and 3- water trucks. Wood Bros utilized the <br />D5CXL and D9 to rip the sump area and started to process the material. Wood Bros. had the scrapers wheel <br />rolling areas to seal moisture. <br />D&E construction utilized the TH83 forklift to unload 6 loads of GCL totaling approximately 226,669ft2, 1 <br />load of Geocomposite totaling approximately 78,300ft2 . D&E filled sandbags and place geocomposite rolls <br />loon the GCL to hold the visquine that covers the GCL in place. <br />Vector Engineering, Inc. CQA observed placement and tested compaction of foundation layer material in the <br />7th , 8th and 9th bays 1 St lift off the north slope of Module 1. CQA performed several density tests with all <br />tests meeting the required specifications. CQA observed unloading and logged all liner materials delivered to <br />the site. <br />Vector discussed with Wood bros. Will have the surveyors on site tomorrow to shoot the sump and leachate collection lines. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />