Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 0316112.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contdq <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />26 54 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-24-03 <br />Thursday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Hot 1010 <br />Frank Dell -Era / JeremyFreas 71 <br />Equipment Utilized. <br />2-631 C Cat Scraper, D9G Dozer, D6 Cat Dozer with disc, Case Tractor with laser scraper box, 825 Sheepsfoot Cat compactor, 3 - <br />Water Trucks. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew Surveyors Group: 2 Man crew D&E: 2 Man crew <br />Wood Bros. continued to place, moisture condition and compact foundation layer material on the southern <br />portion of Module 1. Wood Bros. processed and compacted the 7th bay 2nd lift utilizing the D6 with disc, 825 <br />sheepsfoot compactor, case tractor with scraper box and water truck. Wood Bros. had the scrapers wheel <br />rolling areas moisture conditioned to seal. Wood Bros. had the D9 ripping and processing the borrow area. A <br />scraper left the site today #3129. <br />Surveyors Group Inc.: on site setting grade staking for the V ditches for the LCRS collection laterals. <br />D&E construction utilized the TH83 forklift to unload 1 load of GCL totaling approximately 40,339ft2, 2 <br />loads of 60mil double -textured geomembrane totaling approximately 280,800ft , <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed placement and <br />tested compaction of foundation layer material reworked in the 7th bay 2nd lift. CQA performed several <br />density tests with all tests meeting the required specifications. CQA observed unloading and logged all liner <br />materials delivered to the site. CQA set-up a sieve analysis, Plasticity Index and a moisture density <br />relationship curve on the eastern slope materials. <br />Vector discussed with Wood bros. Will have the surveyor's back on Tuesday. Should complete the floor tomorrow except for the V ditches. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />