My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew Surveyors Group Inc,: 2 Man crew D&E: 2 Man crew <br />Wood Bros. continued to moisture condition and compact subgrade material on the northern slope of module <br />1 utilizing the D5CXL, case tractor with scraper box, water truck and smooth drum roller. Wood Bros. <br />switched out smooth drum rollers. Wood Bros. continued to excavate the soil gas system trenches utilizing <br />Valley Trenching JS36 trencher. Wood Bros. had 5320' of 4" and 160' of 12" pipe SDR 15.5 delivered to the <br />site today. Wood Bros. had 8 loads of 3/8" pea gravel from Granites Tracy plant delivered to the site. Wood <br />Bros. placed geotextile, welded and placed the 4" slotted pipe with 2-3" of pea gravel under the pipe then <br />backfilled to within 1' of the finish grade with pea gravel wrapped in textile in the northern soil gas trench. <br />*Surveyors Group Inc: on site setting grade staking for the V ditches on the south side of Module 1, reset the <br />lysimeter staking, placed construction staking for the sump and started the 50' grid for finish grade on the <br />foundation layer. <br />D&E on site but no liner arrived on site today. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the subgrade <br />material on the northern slope of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications. CQA observed unloading and logged all liner materials delivered to the site. CQA <br />observed unloading and logged pipe delivered to the site. <br />Vector discussed with Wood bros. Tony will get the office to fax the welders certificate to the trailer today. Trailer lost power today but it came <br />back on after the breaker switch was flipped back and forth. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />29 51 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-29-03 <br />Tuesday <br />General Contractor. <br />Liner Contractor <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Hot 1000 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, Water Truck, Bomag Smooth Drum roller, Cleveland JS36 Trencher, John <br />Deere 21OLE skit) loader. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew Surveyors Group Inc,: 2 Man crew D&E: 2 Man crew <br />Wood Bros. continued to moisture condition and compact subgrade material on the northern slope of module <br />1 utilizing the D5CXL, case tractor with scraper box, water truck and smooth drum roller. Wood Bros. <br />switched out smooth drum rollers. Wood Bros. continued to excavate the soil gas system trenches utilizing <br />Valley Trenching JS36 trencher. Wood Bros. had 5320' of 4" and 160' of 12" pipe SDR 15.5 delivered to the <br />site today. Wood Bros. had 8 loads of 3/8" pea gravel from Granites Tracy plant delivered to the site. Wood <br />Bros. placed geotextile, welded and placed the 4" slotted pipe with 2-3" of pea gravel under the pipe then <br />backfilled to within 1' of the finish grade with pea gravel wrapped in textile in the northern soil gas trench. <br />*Surveyors Group Inc: on site setting grade staking for the V ditches on the south side of Module 1, reset the <br />lysimeter staking, placed construction staking for the sump and started the 50' grid for finish grade on the <br />foundation layer. <br />D&E on site but no liner arrived on site today. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the subgrade <br />material on the northern slope of Module 1. CQA performed several density tests with all tests meeting the <br />required specifications. CQA observed unloading and logged all liner materials delivered to the site. CQA <br />observed unloading and logged pipe delivered to the site. <br />Vector discussed with Wood bros. Tony will get the office to fax the welders certificate to the trailer today. Trailer lost power today but it came <br />back on after the breaker switch was flipped back and forth. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.