Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />28 52 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-28-03 <br />Monda <br />General Contractor <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Frit ler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Hot 1030 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot Cat compactor, Water Truck, Cat 660 Smooth Drum roller, <br />Cleveland JS36 Trencher, John Deere 21OLE skip loader. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew D&E: 2 Man crew <br />Wood Bros. continued to process and compact the 7th bay top thin lift utilizing the 825 sheepsfoot <br />compactor, case tractor with scraper box and water truck to moisture condition. Wood Bros. had the cat <br />smooth drum rolling the northern portion of the floor breaking down any small chunks and the western slope. <br />Wood Bros. had the D5CXL dozer, smooth drum roller and the water truck moisture conditioning and <br />compacting the western slope of Module 1. Wood Bros had the laser set-up scraper box finish grading the <br />southern portion of the floor and placing a lift of processed clean material on the western slope. Wood Bros. <br />had Valley Trenching on site excavating the soil gas trench on the north floor of Module 1. Wood Bros. <br />placed the geotextile in the excavated trench. <br />D&E construction utilized the TH83 forklift to unload 1 load of GCL totaling approximately 41,304.86ft2. <br />Vector Engineering, Inc. CQA attended the weekly safety meeting. CQA observed trenching and placement <br />of geotextile for the soil gas system. CQA observed grading, placement and tested compaction on the <br />western slope with all tests performed meeting the required specifications for this project. CQA observed <br />unloading and logged all liner materials delivered to the site. <br />Vector discussed with Wood bros. Pipe should be delivered today and a trencher should start the soil gas system this morning. Surveyors should <br />be on site tomorrow to finish shooting the soil gas system and floor. CQA asked for a certificate for the proposed welder of the HDPE pipe. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />