My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />28 52 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />7-28-03 <br />Monda <br />General Contractor <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Frit ler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Hot 1030 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Utilized: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, 825 Sheepsfoot Cat compactor, Water Truck, Cat 660 Smooth Drum roller, <br />Cleveland JS36 Trencher, John Deere 21OLE skip loader. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew D&E: 2 Man crew <br />Wood Bros. continued to process and compact the 7th bay top thin lift utilizing the 825 sheepsfoot <br />compactor, case tractor with scraper box and water truck to moisture condition. Wood Bros. had the cat <br />smooth drum rolling the northern portion of the floor breaking down any small chunks and the western slope. <br />Wood Bros. had the D5CXL dozer, smooth drum roller and the water truck moisture conditioning and <br />compacting the western slope of Module 1. Wood Bros had the laser set-up scraper box finish grading the <br />southern portion of the floor and placing a lift of processed clean material on the western slope. Wood Bros. <br />had Valley Trenching on site excavating the soil gas trench on the north floor of Module 1. Wood Bros. <br />placed the geotextile in the excavated trench. <br />D&E construction utilized the TH83 forklift to unload 1 load of GCL totaling approximately 41,304.86ft2. <br />Vector Engineering, Inc. CQA attended the weekly safety meeting. CQA observed trenching and placement <br />of geotextile for the soil gas system. CQA observed grading, placement and tested compaction on the <br />western slope with all tests performed meeting the required specifications for this project. CQA observed <br />unloading and logged all liner materials delivered to the site. <br />Vector discussed with Wood bros. Pipe should be delivered today and a trencher should start the soil gas system this morning. Surveyors should <br />be on site tomorrow to finish shooting the soil gas system and floor. CQA asked for a certificate for the proposed welder of the HDPE pipe. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.