Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in con <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 40 40 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-13-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather _T <br />CQA Technician: <br />On site Brown sand silt <br />Clear Warm 940 <br />Frank Dell -Era <br />Equipment Utilized: <br />D5CXL Cat Dozer, Case Tractor with laser scraper box, Water Truck, Bomag Smooth Drum roller, John Deere 21 OLE skip loader, <br />31OSE John Deere Backhoe, 140 cat grader, 853H Bobcat, TH83 Cat Forklift, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew Industrial Fence: 3 Man crew D&E: 11 Man crew <br />Wood Bros. continued to condition and compact subgrade material on the southern slope utilizing the <br />D5CXL, water truck and smooth drum roller. Wood bros. utilized the backhoe to excavate portions of the <br />anchor trench that the trencher could not. Wood Bros. utilized the Case tractor to remove foundation layer <br />material that was over built. Wood Bros. continued excavating and grading the V ditches to finish grade. <br />Wood bros. changed out the Bomag Smooth compactor for an Ingersol Rand smooth drum roller. <br />D&E: unloaded 4 loads of GCL from North County Landfill and stockpiled separately from the other GCL. <br />D&E filled and staged sandbags at the toe of the northern slope. 0 <br />Industrial fence continued to excavate fence postholes utilizing the Bobcat with auger. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer and subgrade materials placed. CQA performed several density tests with all tests meeting the required <br />specifications. <br />Vector discussed with Wood bros. NA ME expects GCL to arrive late this afternoon. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />