Laserfiche WebLink
.7 <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 41 39 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-14-03 <br />Thursda <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Warm 940 <br />Frank Dell -Era / Jeremy Freas <br />Equipment Urnzed: <br />D5CXL Cat Dozer, Water Truck, Ingersol Rand Smooth Drum roller, 31OSE John Deere Backhoe, 140 cat grader, TH83 Cat <br />Forklift, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew Industrial Fence: 3 Man crew D&E: 11 Man crew <br />Wood Bros. continued to condition and compact subgrade material on the southern slope utilizing the <br />D5CXL, water truck and smooth drum roller. Wood Bros. continued excavating and grading the V ditches to <br />finish grade. Wood bros. excavated the southern soil gas riser trench utilizing the backhoe. <br />D&E: unloaded 4 loads of GCL from North County. DE unloaded 2 loads of New GCL (Bentofix NWL) <br />totaling approximately 74,448.36ft2. D&E continued installation of GCL rolls with a minimum of 35lbs peel <br />and 60mil double textured liner. D&E continued to deploy on the north slope of Module 1. D&E installed a <br />total of 20 panels of GCL totaling approximately 25,515ft2 and 15 panels of geomembrane totaling <br />approximately 27,718ft2 all panels were overlapped and seamed per specification's. D&E placed sandbags as <br />ballast on the liner edges prior to leaving the site. <br />Industrial fence started installation of the fence wire and top angle posts with barbed wire. <br />Surveyors Group set staking for the north to south V ditch. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting at North County. CQA observed <br />processing, compaction and tested compaction of the foundation layer and subgrade materials placed. CQA <br />performed several density tests with all tests meeting the required specifications. CQA observed unloading <br />and logged GCL delivered to the site. CQA observed and logged subgrade acceptance, panel deployment, <br />seaming and airtests performed on the liner materials. CQA marked destructive samples for testing. <br />Vector discussed with Wood bros. Surveyors will be back on site tomorrow to shoot finish grade on the V ditches completed. <br />Equipment List / Equipment Numbers Crew D&E / hours worked Crew Wood Bros. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />