My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Luc uuy, any prutnems Ana tnelr sowttons): <br />Wood Brothers: 9 Man crew Industrial Fence: 3 Man crew D&E: 11 Man crew <br />Wood Bros. continued to over excavate a minimum of 2' then moisture condition and compact the v ditches <br />on the southern floor utilizing the grader, water truck and smooth drum roller. Wood Bros. backfilled and <br />compacted the soil gas trench on the north and the lysimeter trench in the sump area. Wood bros. excavated <br />the anchor trench down the eastern slope in the southeast corner utilizing the backhoe. Wood Bros. continued <br />to weld pipe up the eastern slope for the soil gas risers. Wood Bros had laborers hand raking the southern <br />slope. <br />D&E: D&E unloaded 3 loads of New GCL (Bentofix NWL) totaling approximately 111,672.54ft2. D&E <br />continued installation of GCL rolls with a minimum of 35lbs peel and 60mil double textured liner. D&E <br />continued to deploy on the northern slope and started on the floor of Module 1. D&E installed a total of 41 <br />panels of GCL totaling approximately 48,624ft2 and 18 panels of geomembrane totaling approximately <br />47,069ft2 all panels were overlapped and seamed per specification's. D&E performed airtests on all welded <br />seams with passing results. D&E placed sandbags as ballast on the liner edges prior to leaving the site. <br />Industrial fence continued installation of the fence wire and top angle posts with barbed wire. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer and subgrade materials placed. CQA performed several density tests with all tests meeting the required <br />specifications. CQA observed unloading and logged GCL rolls delivered to the site. CQA observed and <br />logged subgrade acceptance, panel deployment, seaming and airtests performed on the liner materials. CQA <br />marked destructive samples for testing. <br />Vector discussed with Wood bros. CQA went over pay items with Tony Piechoto. <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.