My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..,,y P, vu,cus anu sneir solutions): <br />Wood Brothers: 6 Man crew Industrial Fence: 3 Man crew D&E: 11 Man crew <br />Wood Bros. completed excavation and compaction of the southern V ditch and the southern soils gas trench <br />with bentonite amendment utilizing the grader, water truck and smooth drum roller. Wood Bros. had laborers <br />hand raking the southern slope. <br />D&E: D&E unloaded 1 load of Geomembrane material totaling approximately 140,400ft2. D&E continued <br />installation of GCL rolls with a minimum of 35lbs peel and 60mi1 double textured liner. D&E continued to <br />deploy on the western slope and northern floor of Module 1. D&E installed a total of 44 panels of GCL <br />totaling approximately 99,825ft2 and 11 panels of geomembrane totaling approximately 101,200ft2 all panels <br />were overlapped and seamed per specifications. D&E performed some repairs on the liner material. D&E cut <br />destructive samples for testing. D&E placed sandbags as ballast on the liner edges prior to leaving the site. <br />Industrial fence continued installation of the fence wire and top angle posts with barbed wire. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer and subgrade materials placed. CQA performed several density tests with all tests meeting the required <br />specifications. CQA observed unloading and logged Geomembrane rolls delivered to the site. CQA <br />observed and logged subgrade acceptance, panel deployment, seaming and airtests performed on the liner <br />materials. CQA marked and tested destructive samples with all tests performed meeting the project <br />specifications. <br />Vector discussed with Wood bros. continue soils V ditches today until completed, D&E will cut destructive samples for testing. <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.