..,,y P, vu,cus anu sneir solutions): <br />Wood Brothers: 6 Man crew Industrial Fence: 3 Man crew D&E: 11 Man crew <br />Wood Bros. completed excavation and compaction of the southern V ditch and the southern soils gas trench <br />with bentonite amendment utilizing the grader, water truck and smooth drum roller. Wood Bros. had laborers <br />hand raking the southern slope. <br />D&E: D&E unloaded 1 load of Geomembrane material totaling approximately 140,400ft2. D&E continued <br />installation of GCL rolls with a minimum of 35lbs peel and 60mi1 double textured liner. D&E continued to <br />deploy on the western slope and northern floor of Module 1. D&E installed a total of 44 panels of GCL <br />totaling approximately 99,825ft2 and 11 panels of geomembrane totaling approximately 101,200ft2 all panels <br />were overlapped and seamed per specifications. D&E performed some repairs on the liner material. D&E cut <br />destructive samples for testing. D&E placed sandbags as ballast on the liner edges prior to leaving the site. <br />Industrial fence continued installation of the fence wire and top angle posts with barbed wire. <br />Vector Engineering, Inc. CQA observed processing, compaction and tested compaction of the foundation <br />layer and subgrade materials placed. CQA performed several density tests with all tests meeting the required <br />specifications. CQA observed unloading and logged Geomembrane rolls delivered to the site. CQA <br />observed and logged subgrade acceptance, panel deployment, seaming and airtests performed on the liner <br />materials. CQA marked and tested destructive samples with all tests performed meeting the project <br />specifications. <br />Vector discussed with Wood bros. continue soils V ditches today until completed, D&E will cut destructive samples for testing. <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed <br />