Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 45 35 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />8-20-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear Warm 940 <br />Frank Dell -Era / Harry Munster <br />[Zter7ru'ck, Ingersol Rand Smooth Drum roller, 3 10S John Deere Backhoe, 140 cat grader, TH83 Cat Forklift, 227 Cat Track <br />forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew Industrial Fence: 3 Man crew D&E: 11 Man crew <br />Wood Bros. completed grading of the V ditches utilizing the grader, water truck and smooth drum roller. <br />Wood Bros. Started excavation and backfilling the secondary LCRS pipe trench up the eastern slope. <br />D&E: D&E unloaded 1 load of GCL (Bentofix NWL) totaling approximately 37224.18ft2. D&E continued <br />installation of GCL rolls with a minimum of 35lbs peel and 60mi1 double textured liner. D&E continued to <br />deploy on the western slope and northern floor of Module 1. D&E installed a total of 38 panels of GCL <br />totaling approximately 82,325&2 and 9 panels of geoebrane totaling approximately 90,2002 all panels <br />.were overlapped and seamed per specification's. D&E performed some repairs on the liner material. D&E <br />cut destructive samples for testing. D&E placed sandbags as ballast on the liner edges prior to leaving the <br />site. <br />Industrial fence continued installation of the fence wire and top angle posts with barbed wire. <br />Vector Engineering, Inc. CQA observed excavation and checked depth of the secondary leachate collection <br />trench. CQA observed unloading and logged GCL rolls delivered to the site. CQA observed and logged <br />subgrade acceptance, panel deployment, seaming performed on the liner materials. CQA marked and tested <br />destructive samples with all tests performed meeting the project specifications. <br />Vector discussed with Wood bros. continue soils V ditches today until completed, ME will cut destructive samples for testing. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />