My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foothill Sanitary Landfill—Module 1 December 2003 <br /> County of San Joaquin Job No.031602.00.02 <br /> 3.0 CQA PROGRAM <br /> 3.1 Construction Components <br /> The Module 1 construction consisted of earthworks and geosynthetics components and <br /> other work as shown on construction drawings. Vector provided CQA services on both <br /> earthworks and geosynthetics. The earthwork tasks included clearing and grubbing, <br /> foundation layer and sideslope subgrade preparation, LCRS drain gravel installation <br /> (including HDPE pipe), and operations layer placement. The geosynthetics tasks <br /> included installing the GCL, high-density polyethylene (HDPE) geomembrane, <br /> geocomposite, and geotextile. <br /> 3.2 CQA Documents <br /> The construction of Module 1 was conducted from June 18, 2003 to November 26, <br /> 2003 and consisted of the installation of the composite liner system and appurtenances <br /> for Module 1. CQA documentation was prepared by Vector as part of the prescribed <br /> CQA duties and consisted of a system of daily record keeping including daily progress <br /> reports and a record of various test data sheets pertinent to the soils and geosynthetic <br /> components of the liner system. Copies of the original records are being maintained by <br /> Vector and can be made available upon request. <br /> Copies of the construction field reports summarizing the Contractor's progress and <br /> associated CQA activities prepared by our Lead CQA Monitor are presented in <br /> Appendix B of this report. <br /> Tables 1 and 2, included in this report, summarize the soils and geosynthetics testing <br /> requirements per the CQA Plan and Technical Specifications. Within each of the <br /> tables, information on the construction material type, the total quantity of material <br /> placed on the project, the test designation to be performed, the specified testing <br /> frequency, the required number of tests to be conducted, the actual number of tests <br /> conducted, and the actual testing frequency is listed. As shown on the tables, the <br /> actual materials testing frequency on the project satisfies the number of tests required <br /> by the CQA Manual. These tables are part of Vector's internal quality control program to <br /> Vector Engineering,Inc.• 143E Spring Hill Drive•Grass Valley,CA 95945•(530)272-2448 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.