Laserfiche WebLink
Foothill Sanitary Landfill—Module 1 December 2003 <br /> County of San Joaquin Job No.031602.00.02 <br /> 2.2 Project Personnel <br /> The following personnel participated in the construction of Module 1. <br /> Project Role Organization Name <br /> Owner County of San Joaquin Michael Carroll, P.E. <br /> Earthworks Contractor Wood Bros. Inc. Dennis Shamoon <br /> Tony Peicheto <br /> Geosynthetics Subcontractor D&E Construction, Inc. Eric Downs <br /> Larry Kamp <br /> Victor Casillas <br /> Surveying Subcontractor Surveyors Group, Inc. H. Diederich <br /> Design Engineer EMCON/OVVT Fred Cope, P.E. <br /> Certifying Engineer Vector Engineering, Inc. Bryan Fritzler, P.E. <br /> Lead CQA Monitor Vector Engineering, Inc. Ben Dell-Era <br /> CQA Monitor Vector Engineering, Inc. Jeremy Freas <br /> CQA Monitor Vector Engineering, Inc. Nathan Dewitt <br /> Third Party Geosynthetics Lab Precision Geosynthetic Lab. Cora Queja <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> 3 <br />