Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number_ 031602.110 <br />Project Name: <br />Client Or Manager: <br />Daily Field Report Sequence Number. Days left in conIQ <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />60 20 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-11-03 <br />Thursda <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Pei oto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown san4y silt <br />Clear 1000 <br />Frank Dell -Era / GreggHemmen <br />Water Truck, D6LGP and D5CXLCat Dozers, Ingersol Rand Smooth Drum roller. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew D&E: 4 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 18 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP and <br />D5CXL dozers with laser set-up and a laborer watching for wrinkles. Wood Bros continued to weld the 4" <br />perforated LCRS pipe on the floor of Module l.Wood brothers had a load of Class LL base rock delivered <br />for the leachate containment pad construction. Tri state had a load of rebar delivered to the site today. <br />D&E cut destructive samples for testing on seams that had been airtested successfully. D&E performed <br />repairs and general clean-up around the site. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed excavation of the <br />leachate containment pad and pulled a sample of the class II base rock for a proctor curve. CQA observed <br />and logged repairs performed on the liner materials. CQA tested 6 destructive samples with all tests meeting <br />the required specifications. CQA ran 2 sieve analysis on the proposed operations material and 1 sieve on the <br />LCRS drainage aggregate. <br />Vector discussed with Wood bros the subgrade at the eastern edge of liner deployed needs to be moisture conditioned and smooth drum rolled <br />today. Wood Brothers will have the water truck soak it tonight then roll first thing in the morning. <br />0 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />