Laserfiche WebLink
v <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager Daily Field Report Sequence Number. Days left in contract <br />County of San Joaquin 61 <br />19 <br />Foothill Landfill <br />Location of Work: <br />Stockton Ca. <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Mike Carroll <br />9-12-03 Friday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor: <br />Project Engineer: Reviewed By: <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other; <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />C..,.: «... e..♦ T 1.:1:'.,_.1. <br />Clear 910 <br />Frank Dell -Era / Gregg Hemmen <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat Dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew D&E: 12 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 18 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP and <br />D5CXL dozers with laser set-up and a laborer with each piece of equipment watching for wrinkles. Wood <br />Bros brought in a 623 paddle wheel scraper. <br />D&E prior to installation of liner materials smooth drum rolled the subgrade. D&E continued installation of <br />GCL rolls with a minimum of 35lbs peel and 60mi1 double textured liner. D&E continued to deploy on the <br />eastern floor slope of Module 1. D&E installed a total of 33 panels of GCL totaling approximately 70,155ft2 <br />and 6 panels of geomembrane totaling approximately 67,870ft2 all panels were overlapped and seamed per <br />isspecifications. D&E performed air tests on the seams. D&E performed repairs on the northern and eastern <br />slopes. D&E started deployment of 8 ounce filter geotextile off of the western slope at the access ramp so <br />Wood Bros. can start placement of the operations layer material. D&E placed sandbags as ballast on the liner <br />edges prior to leaving the site. <br />Vector Engineering, Inc. CQA observed grading and pulled a sample for testing on the LCRS drainage <br />aggregate imported today. CQA observed and logged subgrade acceptance, panel deployment, seaming, <br />repairs and air tests performed on the liner materials. CQA marked destructive samples on the liner material <br />placed. CQA ran 2 Plasticity Indexes on the proposed operations material. CQA ran a sieve analysis on the <br />LCRS drainage aggregate. CQA tested 2 destructive samples with passing results. <br />Vector discussed with Wood bros Drainage aggregate looks clean, Protective cover placement will start this afternoon or Monday. <br />L File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Bv: <br />