My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />.Bob Numbert fill"' nn <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager-` V✓-Vyr VV <br />County of San Joaquin <br />Daily Field Report Sequence Number. Days left in contAW <br />62 <br />18 <br />Foothill Landfill <br />Location of Work: <br />Stockton Ca. <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Mike Carroll <br />9-15-03 Moeda <br />General Contractor. <br />Wood Brothers <br />Liner Contractor. <br />Project Engineer. Reviewed By: <br />D&E Construction <br />B an Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />On site Brown sandy silt <br />Clear 910 <br />Frank Dell -Era / GreggHemmen <br />Eouinment Utilised' <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat Dozer, 623 Cat Paddle Wheel, Ingersol Rand Smooth Drum roller, TH83 Cat <br />Forklift, 227 Cat Track forklift, 140 Cat Grader. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 8 Man crew D&E:I I Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 14 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP. Wood <br />Bros. started placement of operations material utilizing the 623 to haul the material from soil borrow area A <br />and the D5CXL to spread the material 3' thick off he western slope onto the geotextile placed and seamed on <br />9-12-03. Wood bros utilized the grader, backhoe, water truck and smooth drum roller to spread, grade, <br />moisture condition and compact the 6" base rock for the leachate containment/Truck pad. <br />D&E unloaded 2 loads of Bentofix NWL35 totaling approximately 62,040ft2. D&E prior to installation of <br />liner materials smooth drum rolled the subgrade. D&E continued installation of GCL rolls with a minimum <br />of 351bs peel and 60mil double textured liner. D&E continued to deploy on the northeastern floor of Module <br />1. D&E installed a total of 34 panels of GCL totaling approximately 78,435ft2 and 7 panels of geomembrane <br />totaling approximately 73,828 62 all panels were overlapped and seamed per specifications. D&E did not <br />perform air tests on the seams. D&E placed sandbags as ballast on the liner edges prior to leaving the site. <br />Vector Engineering, Inc. CQA observed grading and pulled a sample for testing on the LCRS drainage <br />aggregate imported today. CQA observed and logged subgrade acceptance, panel deployment, seaming, <br />repairs and air tests performed on the liner materials. CQA marked destructive samples on the liner material. <br />CQA observed placement and grading of the operations material. CQA pulled a sample from the operations <br />material for testing. <br />Vector discussed with Wood bros The operations material must meet the maximum of '/". CQA showed Tony where it was in the <br />specifications. <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed BV.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.