My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number. nat�m nn <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager _�-V--. V <br />County of San Joaquin <br />AW <br />Daily Field Report Sequence Number.Days left in cont <br />64 <br />16 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-17-03 Wednesda <br />General Contractor. <br />Wood Brothers <br />Liner Contractor. <br />Project Engineer: Reviewed By: <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Stockpile 1 Brown sandy silt <br />Clear 880 <br />Frank Dell -Era / Nathan DeWitt <br />Eauinment t ltili7rri• <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat Dozer, 623 Cat Paddle Wheel, Ingersol Rand Smooth Drum roller, TH83 Cat <br />Forklift, 227 Cat Track forklift, 140 Cat Grader. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew D&E: 11 Man crew <br />Wood Bros. continued to import 3/8" pea gravel from Granites Tracy plant utilizing 15 transfer trucks. Wood <br />bros continued to grade the drainage aggregate for the LCRS system utilizing the D6LGP. Wood Bros. <br />continued placement of operations material utilizing the 140 grader to windrow material in stockpile 1 and <br />the 623 paddle wheel to haul the material to the floor with the D5CXL spreading it a minimum of 2' thick <br />across the floor to construct the access ramp. <br />Surveyors group Inc to verify thickness o the drainage aggregate and set points for the county. <br />D&E prior to installation of liner materials smooth drum rolled the subgrade. D&E continued installation of <br />GCL rolls with a minimum of 351bs peel and 60mil double textured liner. D&E started continued to deploy <br />on the northeastern floor of Module 1. D&E installed a total of 38 panels of GCL totaling approximately <br />83,529ft2 and 8 panels of geomembrane totaling approximately89,914ft2 all panels were overlapped and <br />seamed per specifications. D&E performed air tests on the seams welded on 9-16/9-17. D&E placed <br />sandbags as ballast on the liner edges prior to leaving the site. <br />Vector Engineering, Inc. CQA observed grading and pulled a sample for testing on the LCRS drainage <br />aggregate imported today. CQA observed some dirty drainage aggregate and had Wood Bros. removed the <br />clods of soil and push the material to an area until #200 washes could be performed to verify conformance to <br />specifications. CQA observed and logged subgrade acceptance, panel deployment, seaming, repairs and air <br />tests performed on the liner materials. CQA marked and pulled 10 destructive samples with DS#92 failing. <br />CQA informed D&E whom pulled samples A, B, C and D at 15', 30', 60' and 185' north of DS#92 on seam <br />198/199 with A, B, C failing. Sample D pulled at 185' off the south end of seam passed. D&E will Cap strip <br />the southern 185' of seam 198/199. CQA pulled destructive samples on the seam welded by the seamer and <br />machine prior and after the failing tests with both meeting the required specifications. CQA observed <br />placement and grading of the operations material. <br />Vector discussed with Wood Bros. Granites pea gravel had some dirt in a couple of loads this morning and should not be spread out until tests <br />performed and passing specifications. Wood Bros agreed and placed next to the 4'h ramp. <br />0 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.