Laserfiche WebLink
v <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager Daily Field Report Sequence Number. Days left in contract <br />County of San Joaquin 65 <br />15 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-18-03 Thursday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor: <br />Project Engineer. Reviewed By: <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather <br />CQA Technician: <br />On site Brown sandy silt <br />Clear 910 <br />Frank Dell -Era / Nathan DeWitt <br />..y...r....... --. <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat Dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift, <br />140 Cat Grader. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 4 Man crew D&E: 9 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 17 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP. Wood <br />Bros staged some pipe on the eastern end of Module 1. Tri state started forming the leachate containment <br />pad. <br />D&E continued to roll the subgrade prior to installation of liner materials.. D&E continued installation of <br />GCL and 60mi1 double textured liner. D&E continued to deploy off of the west slope on to the floor of <br />Module 1. D&E installed a total of 20 panels of GCL totaling approximately 45,780ft2 and 4 panels of <br />® geomembrane totaling approximately 45,780ft2 all panels were overlapped and seamed per specifications. <br />D&E performed repairs to the tie in seam on the eastern and northern corner toe of slope. D&E did not <br />perform air tests on the seams. D&E placed sandbags as ballast on the liner edges. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed grading and pulled <br />a sample for testing on the LCRS drainage aggregate imported today. CQA observed the drainage aggregate <br />being delivered today appeared to cleaner. CQA observed and logged subgrade acceptance, panel <br />deployment, seaming and repairs and performed on the liner materials. CQA marked destructive samples for <br />testing. CQA ran 2 sieves on the drainage aggregate and 2 sieves on the operations layer material. <br />Vector discussed with Wood bros CQA notified, County and Wood Bros that the #200 wash performed on the dirty drainage aggregate placed to <br />the side of the 41h access ramp failed to meet the specified gradation for this project and will need to be removed. Wood bros will contact Granites <br />plant. <br />v <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed <br />