My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602 00 <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager: <br />County of San Joaquin <br />Daily Field Report Sequence Number Days left in contract <br />67 <br />13 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-22-03 <br />Monday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Const <br />Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Tony Peichoto / Mario Garza <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather <br />CQA Technician: <br />On site Brown sandy silt <br />Clear 1000 <br />Frank Dell -Era / Nathan DeWitt <br />Fnninme t i (tilized: <br />Water Truck, D6LGP Cat Dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 7 Man crew D&E: 8-10 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 13 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP with laser <br />se -up to control grade. Wood Bros. had the water truck continue to maintain moisture in the subgrade and <br />haul routes. Wood Bros had the leachate tank delivered to the site Friday afternoon. <br />Surveyors Group on site setting up control points for the county. <br />Tri State on site placing rebar for the leachate containment pad. <br />®D&E prior to installation of liner materials smooth drum rolled the subgrade. D&E continued installation of <br />GCL rolls with a minimum of 351bs peel and 60mi1 double textured liner. D&E continued to deploy on the <br />floor of Module 1. D&E installed a total of 31 panels of GCL totaling approximately 69,000ft2 and 6 panels <br />of geomembrane totaling approximately 68,090ft2 all panels were overlapped and seamed per specifications. <br />D&E continued to perform repairs on the geomembrane. D&E welded the tie-in seam first thing in the <br />morning so there is no excessive stress on the liner. DE placed sandbags as ballast on the liner edges prior <br />to leaving the site. <br />Vector Engineering, Inc. CQA observed grading and pulled a sample for testing on the LCRS drainage <br />aggregate imported today. CQA observed and logged subgrade acceptance, panel deployment, seaming, <br />repairs performed on the liner materials. CQA marked destructive samples for testing. <br />Vector discussed with. Wood Bros. had Granites plant manager on site to discuss how to remove / mix the pea gravel with 3% plus <br />fines. Wood bros is going to have Granite bring in some clean material and try to mix it with the dirty gravel then have CQA retest. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.