Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 66 14 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />9-19-03 <br />F ida <br />General Contractor. <br />Liner Contractor. <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Ton Peichoto / Ryan Wood <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 940 <br />Frank Dell -Era / Nathan DeWitt <br />G(tClll <br />Waterater Truckck,, D6LGP Cat Dozer. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 15 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP. Wood <br />Bros. had the water truck moisturizing the slopes and subgrade all over the site. Wood Bros welded portions <br />of the 4" LCRS pipe. <br />D&E not on site <br />Vector Engineering, Inc. CQA observed grading of the LCRS drainage aggregate imported today. CQA <br />performed 4- #200 Washes on the operations layer material and 2 washes on the drainage aggregate. CQA <br />logged repairs to be made to the geomembrane, performed a walk through of several panels and marked is <br />destructive samples. <br />Vector discussed with Wood bros Tony Piechoto is leaving the site and Ryan Wood will take over the construction operations.. <br />:7 <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />