My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: <br />Construction of 2 Landfill Modules - <br />Foothill Landfill <br />Location of Work: <br />Stockton Ca. <br />General Contractor. <br />Wood Brothers <br />General Foreman: <br />Ryan Wood <br />Source and Description of Fill <br />Brown sandy silt <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Client Or Manager. <br />County of San Joaquin <br />Owner's Or Client's Repres <br />Mike Carroll <br />Liner Contractor: <br />D&E Construction <br />Daily Field Report Sequence Number Days left in <br />70 10 <br />Date: Day of The Week: <br />9-25-03 Thursda <br />Project Engineer. Reviewed By: <br />Liner Superintendent: <br />Eric Downs/Victor Cassilas <br />Weather <br />Clear 950 <br />Bryan Fritzler <br />Other. <br />CQA Technician: <br />Frank Dell -Era / Nathan DeWitt <br />Rand Smooth Drum roller, THE? 3 Cat <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />227 Cat Track forklift. <br />Wood Brothers: 6 Man crew D&E: 10 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 15 transfer trucks. <br />Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP and the <br />D5CXCL dozers with laborers watching for wrinkles. Wood Bros. excavated the secondary sump trench up <br />the eastern slope utilizing the John Deere backhoe. Wood Bros. continued to moisture condition the <br />subgrade. <br />Tri State continued placement of the rebar for the leachate containment pad. <br />D&E smooth drum rolled areas of the subgrade that were to be lined today. D&E continued installation of <br />isBentofix NWL 35 GCL rolls and 60mil double textured liner. D&E continued to deploy on the eastern floor <br />of Module 1. D&E installed a total of 30 panels of GCL totaling approximately 60,780ft2 and 14 panels of <br />geomembrane totaling approximately 62,150ff2 all panels were overlapped and seamed per specifications. <br />D&E performed air tests on the tie-in seam and liner deployed 9-24-03. D&E performed repairs to material <br />deployed 9-22/9-23. D&E placed sandbags as ballast on the liner edges prior to leaving the site. D&E <br />tracked the failing destructive sample to 240' off of the west end of seam. D&E started welding a cap strip <br />on seam 108/222 where Destructive sample 113 failed. <br />Vector Engineering, Inc. CQA attended the weekly construction meting. CQA observed placement and <br />grading on the LCRS drainage aggregate imported today. CQA observed and logged subgrade acceptance, <br />panel deployment, seaming, airtests, repairs and vacuum tests performed on the liner materials. CQA <br />observed the drainage aggregate was clean. CQA marked destructive samples for conformance testing. CQA <br />tested destructive sample 113B with results meeting the required specifications for this project. D&E will <br />cap strip the entire seam after DS#113B to the west end. No seam was welded prior to 108/222 by seamer <br />and machine that day. DS#113B stands for welded before the destructive sample if 113A was tested it would <br />be after the weld. CQA pulled a destructive sample on the following seam welded by the same machine and <br />welder with passing results. CQA performed 3 washes on the drainage aggregate. <br />Vector discussed with Wood concrete for the leachate containment pad should start on Monday. CQA would like some areas of subgrade <br />around the sump rolled to smooth the subgrade was disturbed due to traffic. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era <br />Reviewed Bv: <br />
The URL can be used to link to this page
Your browser does not support the video tag.