Vector Engineering <br />Daily Field Report <br />jeb N.. h--. nifcm nn <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager. V✓ LVV` yV <br />County of San Joaquin <br />Daily Field Report Sequence Number Days left in con tM <br />74 <br />6 <br />Foothill Landfill <br />Location of Work: <br />Stockton Ca. <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Mike Carroll <br />10-01-03 Wednesday <br />General Contractor. <br />Wood Brothers <br />Liner Contractor <br />D&E <br />Project Engineer: Reviewed By: <br />Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Ryan Wood <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 890 1 <br />Frank Dell -Era / Nathan DeWitt <br />Eauinment Utilized: <br />Water Truck, D6LGP Cat Dozer, D5CXL Cat dozer, Ingersol Rand Smooth Drum roller, TH83 Cat Forklift, 227 Cat Track forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 6 Man crew D&E: 10 Man crew <br />Wood Bros. imported drainage aggregate material from Granites Tracy plant utilizing 17 transfer and end <br />dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing the <br />D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros. performed some minor repairs <br />to the subgrade at the toe of the south slope utilizing the smooth drum to roller. Wood Bros continued <br />placement of operations soil to extend the access ramp on to the middle for Module 1. <br />Tri State continued forming the walls for the leadhate containment area and the sump. <br />D&E continued installation of Bentofix NWL 35 GCL rolls and 60mil double textured liner. D&E deployed <br />in the sump area and on the southern slope of Module 1. D&E installed a total of 64 panels of GCL totaling <br />approximately 54,11582 and 46 panels of geomembrane totaling approximately 60,038ft2 all panels were <br />overlapped and seamed per specifications. D&E performed repairs and vacuum tests to the liner installed for <br />the secondary sump. D&E placed sandbags as ballast on the liner edges prior to leaving the site. . <br />Vector Engineering, Inc. CQA observed placement and pulled a sample of the LCRS drainage aggregate <br />imported today. CQA ran a sieve analysis on the drainage aggregate. CQA observed and logged subgrade <br />acceptance, panel deployment, start-up's, seaming, repairs and vacuum tests performed on the liner <br />materials. CQA marked destructive samples for conformance testing. <br />Vector discussed with Wood Bros. Drainage aggregate looks clean. Concrete pour for the containment pad walls tomorrow @ 11:30-12:30. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />