Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 81 -1 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-10-03 <br />F 'da <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceohlo <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 940 <br />Frank Dell -Era / Nathan DeWitt <br />nquipmunt vunzea: <br />Water Truck, 2-D6LGP Cat Dozers, 2-623 Cat Paddle wheel scrapers, TH83 Cat Forklift, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew D&E: 12 Man crew <br />Wood Bros. continued to import drainage aggregate material from Granites Tracy plant utilizing 7transfer <br />and end dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing <br />the D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations utilizing two 623 paddle wheel scrapers and a D6LGP with a laborer to spread the material. Wood <br />bros. hauled the material from stockpile area A. Wood bros. utilized the water truck and the D5CXL to rip <br />moisture condition the operations. <br />40D&E performed and vacuum tested repairs. D&E installed and sewed seam on the 8 ounce geotextile filter <br />over the drainage aggregate. D&E welded the secondary sump detail to the primary liner system. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate. CQA <br />observed and logged start-up's, seaming, vacuum tests and repairs on the liner materials. CQA pulled 7 <br />destructive samples with all meeting the required specifications for this project. <br />Vector discussed with Wood Bros. CQA will be on site during the entire split shift. <br />1:1 <br />File Name: Foothill LandfilL Prepared By: Frank Dell -Era Reviewed B <br />