My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Joh Numher" nllAtt7 no <br />Project Name: <br />Construction of 2 Landfill Modules- <br />Client Or Manager: ---_ -- <br />County of San Joaquin <br />Daily Field Report Sequence Number Days left in contract <br />83 <br />-3 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-14-03 <br />Tuesday <br />General Contractor <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sand silt I <br />Clear 800 <br />Frank Dell -Era / Nathan DeWitt <br />Equi ment Utilized• <br />F <br />Water Truck, 2-D6LGP Cat Dozers, 2-623 Cat Paddle wheel scrapers, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew D&E: 7 Man crew <br />Wood Bros. continued to import drainage aggregate material from Granites Tracy plant utilizing 15 transfer <br />and end dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing <br />the D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations on the northwest portion of Module 1 utilizing two 623 paddle wheel scrapers and a D6LGP with <br />a laborer to spread the material. Wood Bros. started welding the pipe for the southern most V ditch. <br />D&E performed repairs and vacuum tests to the liner system. D&E installed Boots around the gas collection <br />pipes and the 12" secondary leachate collection pipe. DE spark tested the boots. D&E placed <br />eocomposite on the western slope. The panels were tied a 4' intervals and the seams were sewn. D&E <br />welded a Cap strip for failing seam 276/277. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate imported <br />today. CQA observed and logged start-up's, repairs and vacuum tests performed on the liner materials. CQA <br />pulled 1 destructive sample on the Cap strip installed to replace seam 276/277 with DS#171 meeting the <br />required specifications for this project <br />Vector discussed with Wood Bros. Surveyors to be on site Thursday. <br />C <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.