Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />84 -4 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-15-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 850 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment utilized: <br />Water Truck, 2-D6LGP Cat Dozers, D5CXL Cat dozer, 2-623 Cat Paddle wheel scrapers, 227 Cat Track forklift. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew D&E: 7 Man crew <br />Wood Bros. continued to import drainage aggregate material from Granites Tracy plant utilizing 17 transfer <br />and end dump trucks. Wood bros continued to grade the Drainage aggregate for the LCRS system utilizing <br />the D6LGP with a laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of <br />operations material on the floor of Module 1 utilizing two 623 paddle wheel scrapers and a D6LGP with a <br />laborer to spread the material. Wood Bros utilized the D5CXL to rip and process the operations material in <br />stockpile A. Wood Bros. continued to weld the 4" pipe for the southern V ditch. <br />D&E completed repairs and vacuum testing on the HDPE liner system. D&E completed installation of the <br />pipe boot system around the gas collection pipes and the 12" secondary leachate collection pipe. D&E <br />placed geocomposite on the western slope. The panels were tied a 4' intervals and the seams were sewn. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate imported <br />today. CQA observed and logged start-up's, repairs and vacuum tests performed on the liner materials. CQA <br />observed installation of the clamps for the soil gas and 12" riser pipe boots. CQA performed a sieve analysis <br />on the operations material and on the LCRS drainage aggregate <br />Vector discussed with Wood Bros. CQA discussed working hours with Dave Wang of San Joaquin Ccounty <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B : <br />