My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />ed <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />88 -8 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-21-03 <br />Tuesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather <br />CQA Technician: <br />Brown sandy silt <br />E • t LJt•l• <br />Clear 900 <br />Frank Dell -Era / Nathan DeWitt <br />411 PM r �z . <br />2 -Water Trucks, 2-D6LGP Cat Dozers, D5CXL Cat dozer, 3-623 Cat Paddle wheel scrapers. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 9 Man crew <br />Wood Bros. continued to grade the Drainage aggregate for the LCRS system utilizing the D6LGP with a <br />laser set-up and a laborer watching for wrinkles. Wood Bros continued placement of operations material on <br />the floor of Module 1 utilizing 1-3 623 paddle wheel scrapers and a D6LGP with a laborer to spread the <br />material. Wood Bros utilized the D5CXL to rip and process the operations material in stockpile A. Wood <br />Bros hit the liner on the southern edge of the floor in Module 1. Wood Bros cleared the top of stockpile 2 for <br />use as operations material if acceptable. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile A. CQA performed 4 washes on the operations material. CQA <br />observed and logged damage to the liner at panel 340 northern end. 0 <br />Vector discussed with Wood Bros. all 3scrapers were down from 0900-1200 then 1 running. 2 running at 1730. Wood Bros is going to start <br />hauling from stockpile 2 later today . <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />
The URL can be used to link to this page
Your browser does not support the video tag.