Laserfiche WebLink
L <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 87 -7 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-20-03 <br />Monda <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 920 <br />Frank Dell -Era / Nathan DeWitt <br />cq pment uuuzea: <br />2 -Water Trucks, 2-D6LGP Cat Dozers, D5CXL Cat dozer, 2-623 Cat Paddle wheel scrapers, 590 Super M Case Backhoe. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew <br />Wood Bros. import 2 loads of drainage aggregate material from Granites Tracy plant. Wood bros continued <br />to grade the Drainage aggregate for the LCRS system utilizing the D6LGP with a laser set-up and a laborer <br />watching for wrinkles. Wood Bros continued placement of operations material on the floor of Module 1 <br />utilizing two 623 paddle wheel scrapers and a D6LGP with a laborer to spread the material. Wood Bros <br />started to weld the 6" main header pipe. Wood Bros removed the unsuitable material from the stockpile on <br />Module 1 floor utilizing a 623 to haul the material to a designated area. <br />Electrician: Con J Frank set the power pole with power control panel utilizing a auger attachment on the <br />backhoe to excavate the hole down 5' and a boom Truck to set the pole. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile A. CQA observed the unsuitable material was removed from <br />Module 1. CQA observed welding of the 6" header pipe. <br />Vector discussed with Wood Bros will shut off the gravel haul and concentrate on the operations material for the next couples days. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />