My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />90 -10 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-23-03 <br />Thursda <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather <br />CQA Technician: <br />Brown sandy silt <br />Clear 920 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment Uunzed: - _--1 <br />2 -Water Trucks, 3-D6LGP Cat Dozers, 3-623 Cat Paddle wheel scrapers. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew D&E: 5 Man crew <br />Wood Bros. continued the import of drainage aggregate material from Granites Tracy plant. Utilizing 15 <br />transfer and end dump trucks. Wood bros graded the drainage aggregate utilizing the D6LGP with a laser <br />set-up and a laborer watching for wrinkles. Wood Bros continued placement of operations material on the <br />floor of Module 1 utilizing 3- 623 paddle wheel scrapers and 2- D6LGP with 2-3 laborers to spread the <br />material. Wood Bros. continued to weld the 6" header pipe and crosses to the 4" laterals. Wood bros hit the <br />liner on panel #243. <br />Surveyors Group Inc, verified thickness on area of the floor of Module 1. <br />D&E installed and seamed filter geotextile on areas surveyed and approved for deployment. D&E deployed a 40 <br />total of approximately 18,000ft of geotextile. D&E performed a repair and vacuum tested it. <br />Vector Engineering, Inc. CQA attended the weekly construction meeting. CQA observed placement and <br />grading of the LCRS drainage aggregate and operations layer material from stockpile A. CQA observed <br />Wood bros hit the liner on panel 243. D&E will repair. CQA performed 1 sieve analyses on the operations <br />material and 1 #200 wash. CQA performed a #200 wash on the drainage aggregate. <br />Vector discussed with Wood Bros. D&E will be on site today to deploy geotextile. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Ba f <br />
The URL can be used to link to this page
Your browser does not support the video tag.