Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager: Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 91 -11 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-24-03 <br />F 'da <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 850 <br />Frank Dell -Era / Nathan DeWitt <br />cywp111cnt uuncea. <br />2 -Water Trucks, 2-D6LGP Cat Dozers, 2-623 Cat Paddle wheel scrapers. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew <br />Wood Bros. continued the import of drainage aggregate material from Granites Tracy plant. utilizing 17 <br />transfer and end dump trucks. Wood bros graded the drainage aggregate utilizing the D6LGP with a laser <br />set-up and a laborer watching for wrinkles. Wood Bros continued placement of operations material on the <br />floor of Module 1 utilizing 2- 623 paddle wheel scrapers and a D6LGP with a laborer to spread the material <br />Wood Bros. continued to weld the 6" header pipe and crosses to the 4" laterals. <br />D&E installed and seamed filter geotextile on areas surveyed and approved for deployment. D&E deployed a <br />total of approximately 200,000ft2 of geotextile and a total of approximately 40,500ft2 geocomposite. D&E <br />performed a repair on the southern end of Module 1 on panel #340's northern edge. D&E vacuum tested it. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile A. CQA observed and logged start-up, repair and vacuum testing of <br />liner. CQA performed 1 sieve analyses on the operations material and 1 sieve on the drainage aggregate. <br />Vector discussed with Wood Bros and Dave Wang with County about progress and estimated completion date of the project. Dave explained that <br />Wood bros is to remove as much of Borrow area A as possible and suggested Wood Bros try and get some more equipment to help speed up the <br />completion. Wood bros needs to build a access road/ramp off of borrow area A to the Module. Approximate completion date is 11-14-03. <br />File Name: Foothill Landfill Prepared. By: Frank Dell -Era Reviewed B <br />