Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />J <br />Construction of 2 Landfill Modules- <br />Client Or Manager: Daily Field Report Sequence Number. Days left in contract <br />County of San Joaquin 93 <br />-13 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-28-03 Tuesda <br />General Contractor. <br />Wood Brothers <br />Liner Contractor: <br />D&E Construction <br />Project Engineer. Reviewed By: <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 920 <br />Frank Dell -Era / Nathan DeWitt <br />""F ... I— -u - <br />2 -Water Trucks, 3-D6LGP Cat Dozers, 2-623 Cat Paddle wheel scrapers, TH 227 forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 16 Man crew D&E: 7 Man crew <br />Wood Bros. continued to grade the drainage aggregate utilizing the D6LGP with a laser set-up and a laborer <br />watching for wrinkles. Wood Bros continued placement of operations material on the floor of Module 1 <br />utilizing 2- 623 paddle wheel scrapers and a 2- D6 dozers with 2- laborers to spread the material. <br />Wood Bros. continued to weld the 4" solid riser pipes up the eastern slope laterals. Wood Bros started <br />welding the 18" primary riser pipe. <br />Surveyors Group Inc, on site to verify thickness on the drainage aggregate on the southern and the eastern <br />end of Module 1. Surveyors set some control stakes for the operations layer. <br />*D&E installed and seamed filter geotextile and geocomposite on areas approved for deployment. D&E <br />deployed a total of approximately 103'000ft2 of geotextile on the eastern floor and the southern floor of <br />Module 1. D&E deployed, zip tied and sewn seamed the composite on the northern slope. D&E deployed a <br />total of approximately 20,000ft2 geocomposite. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile A. CQA observed deployment and seaming of geotextile and <br />geocomposite materials deployed. CQA performed 2- #200 washes on the operations material and 14200 <br />wash sieve on the drainage aggregate. CQA observed DE had placed geotextile over areas that had not <br />been approved by the surveyors per Wood bros. request. The areas were out of specification for thickness so <br />Wood Bros. peeled back the geotextile and cut the drainage aggregate to grade and replaced the geotextile <br />material. <br />Vector discussed with Wood Bros Drainage aggregate will start to be imported tomorrow.. <br />File Name: Foothill Landfill Prepared By Frank Dell -Era Reviewed Bv: <br />