Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />94 -14 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-29-03 <br />[Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather <br />CQA Technician: <br />Brown sandy silt <br />Clear 890 <br />Frank Dell -Era / Nathan DeWitt <br />cgUIFuicui vt111c0U; <br />2 -Water Trucks, 3-D6LGP Cat Dozers, 3-623 Cat Paddle wheel scrapers, TH 227 Cat forklift, Scat cat 1500C forklift, Case Tractor <br />with scraper box. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 18 Man crew D&E: 8 Man crew <br />Wood Bros. continued to grade the drainage aggregate utilizing the D6LGP with a laser set-up and a laborer <br />watching for wrinkles. Wood Bros continued placement of operations material on the southern floor and up <br />the northern slope of Module 1 utilizing 3- 623 paddle wheel scrapers and a 2- D6 dozers with 2- laborers to <br />spread the material. <br />Wood Bros. continued to weld the 18" primary riser pipe. Wood Bros started finish grading the operations <br />layer utilizing the Case Tractor with scraper box and laser set-up. <br />D&E installed and seamed geocomposite on the northern slope. D&E deployed a total of approximately <br />63.000ft2 . D&E zip tied and sewn seamed the composite. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile 2. CQA observed deployment and seaming of geocomposite <br />materials deployed. CQA performed 2- sieve analyses on the operations material and 1 -sieve analyses on the <br />drainage aggregate. CQA observed welding of the 18" primary riser pipe. <br />Vector discussed with Wood Bros how many soil gas wells get cow barriers. Looks like the 18" primary riser pipe does not need the elbow.. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />