My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left mi cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />96 -16 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />10-31-03 <br />F 'da <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 600 <br />Frank Dell -Era / Nathan DeWitt <br />cquiPinem uuuzea: <br />2 -Water Trucks, 2-D6LGP Cat Dozers, 2-623 Cat Paddle wheel scrapers, TH 227 Cat forklift, Scat Cat 1500C forklift, Case Tractor <br />with scraper box. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 18 Man crew <br />Wood Bros. imported drainage aggregate from Granites Tracy Plant utilizing a total of 4 trucks. Wood Bros. <br />continued to grade the drainage aggregate utilizing a D6LGP with a laser set-up and a laborer watching for <br />wrinkles. Wood Bros continued placement of operations material on the floor of Module 1 utilizing 2- 623 <br />paddle wheel scrapers and a 1- D6H dozer with 2- laborers to spread the material. Wood Bros. continued to <br />weld the 18" primary riser pipe. Wood Bros continued to finish grade the operations layer utilizing the Case <br />Tractor with scraper box and laser set-up. Wood Bros excavated the post holes for the cattle barriers. <br />C <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile 2. CQA performed 1- #200 wash and 2 sieve analysis on the <br />operations layer material. Dan Johnson with County of San Joaquin on site meeting with PG&E to <br />determine where the power poles need to be established for installation of power to the containment pad <br />area. <br />Vector discussed with Wood Bros The liner damaged needs to be cover so rain water cannot get under the liner. Wood bros will place some <br />GCL and sandbags over the damaged area <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.