Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 98 -18 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-4-03 <br />Tuesday <br />General Contractor. <br />Liner Contractor. <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 580 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment uunzea: <br />2 -Water Trucks, 3-D6LGP Cat Dozers, 3-623 Cat Paddle wheel scrapers, TH 227 Cat forklift, Scat Cat 1500C forklift, Case Tractor <br />with scraper box. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 17 Man crew D&E: 8 Man crew <br />Wood Bros. imported drainage aggregate from Granites Tracy Plant utilizing a total of 6 trucks. Wood Bros. <br />continued to grade the drainage aggregate utilizing a D6LGP with a laser set-up and a laborer watching for <br />wrinkles. Wood Bros continued placement of operations material on the floor of Module 1 utilizing 3- 623 <br />paddle wheel scrapers and a 2- D6 dozers with 2- laborers to spread the material. Wood Bros. continued to <br />install the cattle barriers. Wood Bros continued to finish grade the operations layer utilizing the Case Tractor <br />with scraper box and laser set-up. Wood Bros removed a load of drainage aggregate from Module 1 floor <br />that was rejected due to soil contamination. 0 <br />D&E installed and seamed geocomposite on the northern and eastern slope. D&E deployed a total of <br />approximately 39,20062 of geocomposite. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile 2. CQA informed Mark that the 2nd load of 3/8" pea gravel for the <br />LCRS system has been rejected due to approximately 30% of the load is soil material. CQA observed start- <br />up, repair and vacuum testing of repair made to liner system. CQA observed deployment and seaming of <br />geocomposite materials deployed. CQA performed 1- #200 wash on the operations material. <br />CQA performed density tests on the compacted anchor trench with results tomorrow. <br />Vector discussed with Wood Bros Surveyors will be on site tomorrow. CQA informed Wood bros that the second load of drainage aggregate is <br />rejected and needs to be removed from the LCRS. <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />