My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:21 PM
Creation date
7/3/2020 10:41:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003
RECORD_ID
PR0440004
PE
4433
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
01
SITE_LOCATION
6484 N WAVERLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440004_6484 N WAVERLY_2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r_-1 <br />L__J <br />NO l Eo Mesal ue work completed during the day, any problems and their solutions): <br />Wood Brothers: 17 Man crew D&E: 8 Man crew <br />Wood Bros. imported drainage aggregate from Granites Tracy Plant utilizing a total of 5 trucks. Wood Bros. <br />continued to grade the drainage aggregate utilizing a D6LGP with a laser set-up and a laborer watching for <br />wrinkles. Wood Bros continued placement of operations material on the floor of Module 1 utilizing 3- 623 <br />paddle wheel scrapers and a D6 dozer with a laborer to spread the material. Wood Bros continued to finish <br />grade the operations layer utilizing the Case Tractor with scraper box and laser set-up. Wood Bros welded <br />the southern most 4' riser pipe up the east slope. Wood Bros. pumped the water from the sump area. <br />�D&E installed and seamed geocomposite and geotextile materials on the eastern slope and the eastern floor <br />f Module 1. D&E deployed a total of approximately 12,290ft2 of geocomposite and a total of approximately <br />5,682.5ft2 of geocomposite. D&E removed and replace damaged GCL from under panel #310 prior to <br />performing and vacuum testing a repair to the liner on panel #310. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile 2. CQA observed start-up, repair and vacuum testing of repair made <br />to liner system. CQA observed deployment and seaming of geocomposite materials deployed. CQA <br />performed 1- sieve on the operations material. CQA performed density tests on the compacted anchor trench <br />with tests meeting the requirements for this project. <br />Vector discussed with Wood Bros possibility of rain tomorrow afternoon so Wood Bros should check all open ends of textile and composite so <br />no contamination of the drainage aggregate can occur. <br />is <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. <br />Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />99 <br />-19 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-5-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 650 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment Utilized: <br />2 -Water Trucks, 3-D6LGP Cat Dozers, 3-623 Cat Paddle wheel scrapers, TH 227 Cat forklift, Scat Cat 1500C forklift, Case Tractor <br />with scraper box. <br />t►tnmce m_.,__e�_ _ <br />NO l Eo Mesal ue work completed during the day, any problems and their solutions): <br />Wood Brothers: 17 Man crew D&E: 8 Man crew <br />Wood Bros. imported drainage aggregate from Granites Tracy Plant utilizing a total of 5 trucks. Wood Bros. <br />continued to grade the drainage aggregate utilizing a D6LGP with a laser set-up and a laborer watching for <br />wrinkles. Wood Bros continued placement of operations material on the floor of Module 1 utilizing 3- 623 <br />paddle wheel scrapers and a D6 dozer with a laborer to spread the material. Wood Bros continued to finish <br />grade the operations layer utilizing the Case Tractor with scraper box and laser set-up. Wood Bros welded <br />the southern most 4' riser pipe up the east slope. Wood Bros. pumped the water from the sump area. <br />�D&E installed and seamed geocomposite and geotextile materials on the eastern slope and the eastern floor <br />f Module 1. D&E deployed a total of approximately 12,290ft2 of geocomposite and a total of approximately <br />5,682.5ft2 of geocomposite. D&E removed and replace damaged GCL from under panel #310 prior to <br />performing and vacuum testing a repair to the liner on panel #310. <br />Vector Engineering, Inc. CQA observed placement and grading of the LCRS drainage aggregate and <br />operations layer material from stockpile 2. CQA observed start-up, repair and vacuum testing of repair made <br />to liner system. CQA observed deployment and seaming of geocomposite materials deployed. CQA <br />performed 1- sieve on the operations material. CQA performed density tests on the compacted anchor trench <br />with tests meeting the requirements for this project. <br />Vector discussed with Wood Bros possibility of rain tomorrow afternoon so Wood Bros should check all open ends of textile and composite so <br />no contamination of the drainage aggregate can occur. <br />is <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed By: <br />
The URL can be used to link to this page
Your browser does not support the video tag.