Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager Daily Field Report Sequence Number. Days left in cont <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 104 -24 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-12-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt I <br />Cloudy Warm 700 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment unuzea: <br />Water Truck, D6LGP Cat Dozers, 623 Cat Paddle wheel scraper, Case Tractor with scraper box. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew <br />Wood Bros. continued to clean the sump and LCRS drainage aggregate that was contaminated during the <br />rain last weekend. Wood bros utilized 4 laborers and the water truck to shovel, sweep and spray the sump <br />area to clean the liner for inspection. Wood bros installed the interceptor flap and surrounding drainage <br />aggregate. Wood Bros finish graded the southern middle floor of Module 1 utilizing the Case tractor with <br />scraper box and laser set-up and a 623 scraper. Wood bros removed wet operations material from 3 areas on <br />the floor and replaced with dryer material <br />Con J Franke electrician on site working on electrical conduit to leachate control panel box. And ground bar <br />for sump pump panel. 0 <br />Vector Engineering, Inc. CQA observed cleaning of liner in the sump. CQA observed removal of <br />contaminated drainage aggregate from around the sump area. CQA performed 1- #200 wash and 1 sieve <br />analysis on the operations material. CQA performed density tests on the compacted anchor trench with tests <br />meeting the requirements for this project. CQA observed that the 623 spun tires in a soft spot. The geotextile <br />was exposed and checked for damage. No damage was found. <br />Vector discussed with Wood Bros rain possible on Friday with Dave Wang. Wood Brothers employees are not to take anything out of the trailer <br />at the foothill site without permission. <br />r� <br />U <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed Bv: <br />