Laserfiche WebLink
Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin 103 -23 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-11-03 <br />Tuesda <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear 550 <br />Frank Dell -Era / Nathan DeWitt <br />Equipment Utilized: <br />Water Truck, D6LGP Cat Dozers. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 10 Man crew LLSI: 4 Man crew <br />Wood Bros. continued to pump the sump utilizing 3- 3" pumps. Wood bros continued to utilize the D6LGP <br />to turn the wet soils along the edge of placement to dry back. <br />Con J Franke on site working on the leachate control panel. <br />LLSI continue to survey the north western floor and the northern slope of Module 1. No leaks were found on <br />area surveyed yesterday. Results from today will not be available until next week. LLSI demobed from site <br />due to no other areas were completed for survey. LLSI will return probably by Wednesday <br />*Vector Engineering, Inc. CQA observed pumping of the sump, LLSI survey, and turning of the operations <br />material to dry. CQA performed 1- #200 wash and 1 sieve analysis on the operations material <br />Vector discussed with Wood Bros Sump will need to be cleaned out for inspection. Wood Brothers will start back up tomorrow morning. Wood <br />Bros is not going to run the scrapers tomorrow. D&E does not expect its Geocomposite to be on site until Friday. <br />L <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />