Laserfiche WebLink
17, <br />Vector Engineering <br />Daily Field Report <br />Job Number: 031602.00 <br />Project Name: <br />Client Or Manager. <br />Daily Field Report Sequence Number. Days left in contract <br />Construction of 2 Landfill Modules- <br />County of San Joaquin <br />109 -29 <br />Foothill Landfill <br />Location of Work: <br />Owner's Or Client's Representative <br />Date: <br />Day of The Week: <br />Stockton Ca. <br />Mike Carroll <br />11-19-03 <br />Wednesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer. <br />Reviewed By: <br />Wood Brothers <br />D&E Construction <br />Bryan Fritzler <br />General Foreman: <br />Liner Superintendent: <br />Other. <br />Mark Ceolho <br />Eric Downs/Victor Cassilas <br />Source and Description of Fill Material: <br />Weather. <br />CQA Technician: <br />Brown sandy silt <br />Clear Cool 600 <br />Frank Dell -Era <br />cyuiPuicui u 1114CU. I <br />Water Truck, 2- D6LGP Cat Dozers, 2-623 Cat Paddle wheel scrapers. <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Wood Brothers: 12 Man crew <br />Wood Bros. completed placement of operations material except around the liner edge. Wood bros. utilized 2 <br />623 scrapers and 2- D6 dozers with 2- laborers. Wood bros. completed compaction of the anchor trench <br />around Module 1. Wood Bros. continued to grade the operations layer utilizing the case tractor with scraper <br />box and laser set-up. Wood bros performed general clean up around the site. <br />Vector Engineering, Inc. CQA observed spreading and grading of the operations material. CQA observed <br />and tested compaction of the anchor trench. <br />0 <br />Vector discussed with Wood scraper on floor needs to be removed and the access ramp needs to be excavated out. <br />�J <br />File Name: Foothill Landfill Prepared By: Frank Dell -Era Reviewed B <br />